Long An province prepares for construction of Ho Chi Minh City Ring Road 4 project

View : 481
The investment project to build Ho Chi Minh City Ring Road 4 through Long An province has a total length of about 78.3 km, of which a 3.8 km section is located in Ho Chi Minh City...

According to the Department of Transport of Long An province, the locality is focusing on preparing for the investment project of Ho Chi Minh City Ring Road 4, ensuring readiness when the project is approved by competent authorities. Mr. Dang Hoang Tuan, Director of the Department of Transport of Long An province, said that up to now, the province has completed the pre-feasibility study dossier and sent it to Ho Chi Minh City to synthesize and complete the comprehensive pre-feasibility study report of the Ho Chi Minh City Ring Road 4 construction project, to submit to the National Assembly for consideration and approval in the next session.

Specifically, the investment project to build Ring Road 4 through Long An province has a total length of about 78.3 km, of which a 3.8 km section is located in Ho Chi Minh City. The starting point of the route is at Thay Cai canal, located on the border between Cu Chi district (Ho Chi Minh City) and Duc Hoa district (Long An province), and the end point is at Hiep Phuoc port area, Nha Be district, Ho Chi Minh City, connecting to the North-South axis.

The investment scale in the completion phase includes an expressway with 8 lanes, a design speed of 100 km/h, along with parallel roads on both sides, each side has at least 2 lanes, a design speed of 60 km/h. In phase 1, the project will invest in a 4-lane expressway with a speed of 100 km/h, along with parallel roads in sections that overlap with existing roads.

The project includes 27 intersections, including 10 interchanges, 16 direct interchanges and 1 entry and exit point. In phase 1, 7 interchanges and 14 direct interchanges will be invested, along with 1 entry and exit point.

Site clearance will be carried out on a full scale, ensuring space for 8 expressway lanes and parallel roads, along with supporting facilities such as service stations, toll stations, interchanges, and level crossings.

Sơ đồ hướng tuyến dường Vành đai 4 TP.HCM (đường màu cam)

Unanimously, the Beltway 4 project through Long An will be a standard expressway.

The Long An Provincial People's Committee has agreed to choose the option of building Ho Chi Minh City Ring Road 4 through the province as a 25.5m wide expressway. In particular, along this expressway there will be a rest stop combined with a 10ha commercial and service area.

In order to facilitate traffic and promote local economic development and to synchronize with other provinces and cities on the route, including Binh Duong, Dong Nai, Ba Ria - Vung Tau and Ho Chi Minh City.

The bridges on the route will be arranged in a 2-unit style, each unit is 12.25m wide. In particular, the road section from after Can Giuoc Bridge to the border of Long An province and Ho Chi Minh City, 5.7km long, will be built on high ground.

Related Post

Decor
IMG Phuoc Dong started construction of an industrial - energy - welfare complex worth more than VND 3,600 billion in Tay Ninh
11-05-2026
IMG Phuoc Dong started construction of an industrial - energy - welfare complex worth more than VND 3,600 billion in Tay Ninh

On May 4, 2026, at Phuoc Dong Wharf Industrial Park (Tay Ninh), IMG Phuoc Dong held the Groundbreaking Ceremony of High-rise Factory Cluster and 110kV Transmission Line - Transformer Station, and at the same time broke ground on the Worker Housing - Expert Housing Project. The event marks an important development step in the strategy of perfecting a modern, synchronous and sustainable industrial ecosystem in the Southern region.

 

IMG Phuoc Dong invests over VND 3,600 billion to develop a modern industrial park ecosystem
04-05-2026
IMG Phuoc Dong invests over VND 3,600 billion to develop a modern industrial park ecosystem

On the morning of April 29, 2026, in Tay Ninh, IMG Phuoc Dong Joint Stock Company officially broke ground on a High-rise Factory cluster integrated with 110kV power infrastructure and a worker and expert housing development. With a total investment exceeding VND 3,623 billion, the project contributes to completing a modern, fully integrated, and sustainable industrial park ecosystem.

IMG GROUP – BUILDING LEGACIES, SHAPING THE FUTURE
02-05-2026
IMG GROUP – BUILDING LEGACIES, SHAPING THE FUTURE

With over 30 years of establishment and development, IMG Group has steadily affirmed its position in the real estate and multi-sector investment market. The Group continues to deliver sustainable, value-driven developments, contributing to socio-economic growth in Vietnam while expanding its international footprint.

TAY NINH ADDS A VND 3,600+ BILLION INDUSTRIAL INFRASTRUCTURE CLUSTER AT PHUOC DONG INDUSTRIAL PARK & PORT
01-05-2026
TAY NINH ADDS A VND 3,600+ BILLION INDUSTRIAL INFRASTRUCTURE CLUSTER AT PHUOC DONG INDUSTRIAL PARK & PORT

On the morning of April 29, at Phuoc Dong Industrial Park & Port (Tay Ninh), IMG Phuoc Dong Joint Stock Company, in coordination with local authorities, held the groundbreaking ceremony for a multi-storey factory cluster, a 110kV power system, and the commencement of the worker and expert housing project. With a total investment exceeding VND 3,623 billion, the project is expected to provide a strong impetus for green and sustainable industrial development in the region.

Introdution
Introdution
Products
Products
Home
News
News
Contact
Contact
Search products Search products