phuoc dong industrial park and port

Phuoc Dong Industrial Park and Port

1. PHUOC DONG INDUSTRIAL PARK LOCATION:

Phuoc Dong Industrial Park is located in Hamlet 5, Provincial Road 826B, Can Duoc District, Long An Province. Located in the strategic area of ​​​​priority industrial development "Adjacent to Vam Co River", convenient traffic network:
+ North: Adjacent to Provincial Road 826B, existing residential area along Provincial Road 826B and rice fields.
+ South: Adjacent to Vam Co River
+ East: Adjacent to Nuoc Man Canal
+ West: Adjacent to rice fields and existing residential - resettlement area.

TRAFFIC SYSTEM
* Traffic outside the Industrial Park:
- School: 1-2km from the Industrial Park
- General Hospital: 3km from the Industrial Park
- District and Provincial Administrative Center: 4-6km from the Industrial Park
- Bank: 3km from the Industrial Park
- Market, Commercial Center: 2-4km from the Industrial Park
* Main Road of the Industrial Park:
16m main road with 4 lanes, 8m internal road with 2 lanes, hot asphalt concrete and designed according to VN standards.

2. LAND USE PLANNING:

Total area: 128.8 hectares. Of which:
1. Industrial park land: 92.39 hectares
2. Green land: 13.30 hectares
3. Technical infrastructure land: 1.45 hectares
4. Administrative - service land: 1.70 hectares
5. Traffic land: 20.04 hectares

3. PHUOC DONG INTERNATIONAL SEAPORT:

Area scale: 50ha
1. Port length: 1.8km
2. Port width: 30m x 350m (phase 1)
3. Including 2 wharves with loading capacity: 20,000 DWT
4. Logistics warehouse: 2.43ha (expected to develop 16.5ha).

4. INDUSTRIES ATTRACTING INVESTMENT:

- Electronics, information technology, media, telecommunications industry (including stages according to the Project's closed production technology such as painting, spraying, electroplating, cleaning metal surfaces with chemicals, etc.);
- Industry for manufacturing, repairing, assembling motorbikes, cars, tractors and other means of transport (including stages according to the Project's closed production technology such as painting, spraying, electroplating, cleaning metal surfaces with chemicals, etc.);
- Industry for manufacturing construction steel, steel pipes (including stages according to the Project's closed production technology such as painting, electroplating, cleaning metal surfaces with chemicals, polishing metal, etc.; no casting, no smelting);
- Industry for manufacturing wooden furniture, interior decoration; processing wood, wood chips from natural wood; construction materials (no cement production, no clinker production, no lime production); paints used in construction;
- Ceramic, glass, crystal industry;
- Chemical and plastic production industry; plastic products, paints;
- Textile and garment industry (no dyeing, no bleaching, no washing and grinding);
- Food, foodstuff, animal feed processing industry (no fresh ingredients); beverage production;
- Pharmaceutical production industry;
- Cosmetics, industrial chemical additives production industry;
- Sports and fitness equipment, toys, jewelry production industry;
- Office tools, supplies, equipment (excluding industries related to printing ink).
- Production of products serving agriculture; production, mixing of fertilizers (excluding pesticides);
- Electricity and solar power production and distribution industry;
- Production and distribution of gas, industrial gas, medical gas; hot water, steam, industrial steam (hot steam, thermally saturated steam);
- Center for research, development and application of technology.
- Advertising, displaying, introducing and trading products;

5. HIGH-RISE PRE-BUILT FACTORY

SCALE: 10ha
- Height: 5 floors.
- Load capacity: ground floor 2 tons/m2, upper floor 1 ton/m2.
- Main power station: 6,000 KVA
- Basic lighting system, fire protection, fire alarm equipment.

6. LOW-RISE PRE-BUILT FACTORY

SCALE: 25ha
- Factory area from: 1,600m2 – 19,200m2
- Lowest height: 8.3m
- Roof height: 13.1m
- Load capacity: 2 tons/m2
- Main power station: 3,000 KVA/factory

7. POWER SUPPLY SYSTEM:

- 110/22KV source – (16 plus 40) MVA
- Rooftop solar power system (on factory roofs): Capacity 31.35 MW

8. WATER SUPPLY SYSTEM

- Capacity 5,000m3/day and night. Can Duoc Water Supply Plant
- Pipe  = 110 mm – 315 mm

9. WASTEWATER TREATMENT SYSTEM

- Wastewater treatment plant with capacity of 3,000m3/day and night; Enterprises internally treat wastewater to meet column B standards.
- Industrial park wastewater treatment to meet column A standards according to QCVN 40:2011/BTNMT before discharging into the environment.




Xem chi tiết tại website
Project Name PHUOC DONG INDUSTRIAL PARK AND PORT
Location Hamlet 5, Provincial Road 826B, Phuoc Dong Commune, Can Duoc District, Long An Province
Total Land Area 128,8 ha
Industrial Zone Construction Area 92,39 ha
International Seaport Area 50 ha
Low-rise Factory Area 25 ha
High-rise Factory Area 10 ha
Total Investment 430 million USD (including seaport part)
Investor IMG Phuoc Dong Joint Stock Company
Prize Phuoc Dong Port Industrial Park was honored to receive the second prize in National Urban Planning on December 12, 2021.
Website https://imgphuocdong.vn/
Completion Date March 21, 2021

TÌM KIẾM SẢN PHẨM